English
Discuss a project

← Project register1 / 20

Drilling of 148 Wells for Oil Drilling Rigs

Uzbekistan (multiple sites) · 2004–2012 · General contractor

Project data

Contract value
$19.2M
Status
Completed
Years
2004–2012
Role
General contractor
Region
Uzbekistan (multiple sites)
Client
UzGazOil LLC / GISSARNEFTIGAZ JV

Description

Drilling of 148 exploration and production wells for the technical needs of oil drilling rigs and construction of water supply systems at the facilities. Scope included construction of temporary access roads, drilling pads, rotational camps, and foundations for drilling rigs and auxiliary equipment.

Scope of work

  1. 148 exploration and production wells
  2. Water supply systems at rig facilities
  3. Temporary access roads and drilling pads
  4. Rotational camps and rig foundations

Planning a similar project? Send the documents — we reply within 24 hours

Discuss a similar project