← Project register1 / 20
Drilling of 148 Wells for Oil Drilling Rigs
Uzbekistan (multiple sites) · 2004–2012 · General contractor
Project data
- Contract value
- $19.2M
- Status
- Completed
- Years
- 2004–2012
- Role
- General contractor
- Region
- Uzbekistan (multiple sites)
- Client
- UzGazOil LLC / GISSARNEFTIGAZ JV
Description
Drilling of 148 exploration and production wells for the technical needs of oil drilling rigs and construction of water supply systems at the facilities. Scope included construction of temporary access roads, drilling pads, rotational camps, and foundations for drilling rigs and auxiliary equipment.
Scope of work
- 148 exploration and production wells
- Water supply systems at rig facilities
- Temporary access roads and drilling pads
- Rotational camps and rig foundations
