English
Discuss a project

We build water supply infrastructure

Transmission mains, water intake and distribution facilities, water towers — in 12 regions of Uzbekistan since 2001. 20 major projects with a combined value of more than 55 million US dollars.

We reply to enquiries within 24 hours · +998 55 055 37 37

Clients
Uzsuvtaminot, Uzkommunkhizmat, regional administrations.
Funders
EBRD, OPEC Fund, Saudi Fund for Development, World Bank.
30–1200 mh ≥ frost depthair valvewashoutØ 32–1200 mmTransmission mainup to 200 km a year10–75 m³Water towerDistribution networkservice connectionhydraulic grade lineWellsstatic leveldynamic levelsubmersible pumpaquiferChlorinationClean-water reservoirPumping stationsecond lift · 300–30,000 m³/daycheck valvegate valvepressure gauge
01 · Annual capacity

Up to 200 km of water pipeline, 50 distribution units and 50 water towers a year

ItemStructureAnnual volumeParameter
01Water pipelinesup to 200 kmdiameter 32–1200 mm
02Water distribution unitsup to 50300–30,000 m³/day
03Water intake facilities—buildings and structures of more than 5,000 m³
04Water towersup to 5010–75 m³
05Hydrogeological wellsabout 120depth 30–1200 m

Source: company presentation, 2025.

Well depth (up to 1200 m): company data, 2026.

02 · Project register

20 projects, each with its client and contract value

YearsProjectRegionClient / funderValueStatus
2004–2012Drilling 148 wells for oil drilling rigsUzbekistan, multiple sitesUzGazOil / GISSARNEFTIGAZ JV$19.2MCompleted
2019–2022Improvement of drinking water supply, Koshrabad District (W/3.1 and W/4.1)Samarkand RegionUzkommunkhizmat Agency; employer: Samarqand Suv Ta’minoti LLCOPEC Fund, Saudi Fund for Development$5.54MCompleted
2022–2024Reconstruction of the Yangiyul city water supply systemTashkent RegionMedium-Size Cities PIU, Ministry of Economy and FinanceWorld Bank (IBRD)$5.59MCompleted
2022–presentReconstruction of the Zhiydakapa water intakeNamangan RegionUzsuvtaminot JSCEBRD$5.21MOngoing
2015–2017Construction of water supply systems in Syrdarya RegionSyrdarya RegionEngineering Company, Single Customer Service$3.7MCompleted
2023–presentWater supply to northern Namangan, phase 2Namangan CityNamangan Suv TaminotiOPEC Fund$3.48MOngoing
03 · Services

We build a water supply system from start to finish

Services and work volumes
  • Water pipeline construction

    Transmission and distribution networks from 32 to 1200 mm, polyethylene and steel pipe. Up to 200 km a year.

  • Water intake and distribution facilities

    Pumping stations, reservoirs and water distribution units of 300 to 30,000 m³ a day.

  • Water towers

    From 10 to 75 m³, up to 50 a year.

  • Civil and structural works

    Concrete structures, pumping station buildings, earthworks, access roads.

  • Hydrogeological wells

    From 30 to 1200 metres deep, about 120 a year.

04 · Equipment

Our own fleet: excavators, cranes, pipe welding machines

  • 01Hyundai and JCB excavators and loaders.
  • 02Sany STC500 truck crane (50 t).
  • 03Turan Makina pipe welding machines (180–800 mm).
  • 04Shacman dump trucks.
  • 057 drilling rigs of 6 models: URB-3AM (2 units), URB-2D3, URB-2.5, YDZ1500, UKS-22, BA-15.
Equipment list
  • Hyundai Robex 210W-9S, wheeled excavator
    Hyundai Robex 210W-9S1 units
  • Hyundai Robex 140W-9S, wheeled excavator
    Hyundai Robex 140W-9S2 units
  • JCB 4CX, backhoe loader
    JCB 4CX1 units
  • Sany STC500, truck crane
    Sany STC5001 units
  • Shacman F3000, dump truck
    Shacman F30004 units
  • Turan Makina AL 800, pipe welding machine
    Turan Makina AL 8002 units

Photos show the equipment models.

05 · Clients

Government clients and international financial institutions

Clients

  • Uzsuvtaminot JSC
  • Uzkommunkhizmat Agency
  • Syrdarya Regional Administration
  • Namangan Regional Administration
  • Samarkand Regional Administration
  • Yangiyul City Administration
  • UzGazOil
  • UzAuto
  • ORIENT Holding

Funders

  • European Bank for Reconstruction and Development
  • OPEC Fund
  • Saudi Fund for Development
  • World Bank
  • Asian Development Bank
06 · Certificates

Three management system certificates

O‘z DSt ISO are national standards of Uzbekistan identical to the corresponding ISO standards.

  • O‘z DSt ISO 9001:2015Quality management
  • O‘z DSt ISO 14001:2019Environmental management
  • O‘z DSt ISO 45001:2020Occupational health and safety

Certificates issued by AVVISO CERT LLC.

07 · Frequently asked questions

Water well drilling and water supply — common questions

Do you drill artesian wells in Tashkent and other regions of Uzbekistan?

Yes. SUV-TARAQQIYOT LLC drills artesian and hydrogeological wells in 12 regions of Uzbekistan, including Tashkent city and region, Namangan, Samarkand, Kashkadarya and Syrdarya. Drilling depth is 30 to 1200 m, about 120 wells a year.

What water pipeline diameters and materials do you install?

We build transmission mains and distribution networks from 32 to 1200 mm in diameter in polyethylene (HDPE) and steel pipe — up to 200 km a year for municipal water supply and industrial sites.

Do you deliver projects financed by the World Bank, the EBRD and the OPEC Fund?

Yes. Projects in the register: Zhiydakapa water intake (NWP-6) — EBRD; Koshrabad District (W/3.1, W/4.1) — OPEC Fund and Saudi Fund for Development; Namangan City, Phase 2 (NWSP/ICB/W-4-2) — OPEC Fund; Yangiyul water supply (MSC-Y/W/1.2) — World Bank (IBRD Loan 8914-UZ), under FIDIC conditions.

Send us your project documents — we reply within 24 hours

Discuss a project