We build water supply infrastructure
Transmission mains, water intake and distribution facilities, water towers — in 12 regions of Uzbekistan since 2001. 20 major projects with a combined value of more than 55 million US dollars.
We reply to enquiries within 24 hours · +998 55 055 37 37
- Clients
- Uzsuvtaminot, Uzkommunkhizmat, regional administrations.
- Funders
- EBRD, OPEC Fund, Saudi Fund for Development, World Bank.
Up to 200 km of water pipeline, 50 distribution units and 50 water towers a year
| Item | Structure | Annual volume | Parameter |
|---|---|---|---|
| 01 | Water pipelines | up to 200 km | diameter 32–1200 mm |
| 02 | Water distribution units | up to 50 | 300–30,000 m³/day |
| 03 | Water intake facilities | — | buildings and structures of more than 5,000 m³ |
| 04 | Water towers | up to 50 | 10–75 m³ |
| 05 | Hydrogeological wells | about 120 | depth 30–1200 m |
Source: company presentation, 2025.
Well depth (up to 1200 m): company data, 2026.
20 projects, each with its client and contract value
| Years | Project | Region | Client / funder | Value | Status |
|---|---|---|---|---|---|
| 2004–2012 | Drilling 148 wells for oil drilling rigs | Uzbekistan, multiple sites | UzGazOil / GISSARNEFTIGAZ JV | $19.2M | Completed |
| 2019–2022 | Improvement of drinking water supply, Koshrabad District (W/3.1 and W/4.1) | Samarkand Region | Uzkommunkhizmat Agency; employer: Samarqand Suv Ta’minoti LLCOPEC Fund, Saudi Fund for Development | $5.54M | Completed |
| 2022–2024 | Reconstruction of the Yangiyul city water supply system | Tashkent Region | Medium-Size Cities PIU, Ministry of Economy and FinanceWorld Bank (IBRD) | $5.59M | Completed |
| 2022–present | Reconstruction of the Zhiydakapa water intake | Namangan Region | Uzsuvtaminot JSCEBRD | $5.21M | Ongoing |
| 2015–2017 | Construction of water supply systems in Syrdarya Region | Syrdarya Region | Engineering Company, Single Customer Service | $3.7M | Completed |
| 2023–present | Water supply to northern Namangan, phase 2 | Namangan City | Namangan Suv TaminotiOPEC Fund | $3.48M | Ongoing |
We build a water supply system from start to finish
Water pipeline construction
Transmission and distribution networks from 32 to 1200 mm, polyethylene and steel pipe. Up to 200 km a year.
Water intake and distribution facilities
Pumping stations, reservoirs and water distribution units of 300 to 30,000 m³ a day.
Water towers
From 10 to 75 m³, up to 50 a year.
Civil and structural works
Concrete structures, pumping station buildings, earthworks, access roads.
Hydrogeological wells
From 30 to 1200 metres deep, about 120 a year.
Our own fleet: excavators, cranes, pipe welding machines
- 01Hyundai and JCB excavators and loaders.
- 02Sany STC500 truck crane (50 t).
- 03Turan Makina pipe welding machines (180–800 mm).
- 04Shacman dump trucks.
- 057 drilling rigs of 6 models: URB-3AM (2 units), URB-2D3, URB-2.5, YDZ1500, UKS-22, BA-15.

Hyundai Robex 210W-9S1 units 
Hyundai Robex 140W-9S2 units 
JCB 4CX1 units 
Sany STC5001 units 
Shacman F30004 units 
Turan Makina AL 8002 units
Photos show the equipment models.
Government clients and international financial institutions
Clients
- Uzsuvtaminot JSC
- Uzkommunkhizmat Agency
- Syrdarya Regional Administration
- Namangan Regional Administration
- Samarkand Regional Administration
- Yangiyul City Administration
- UzGazOil
- UzAuto
- ORIENT Holding
Funders
- European Bank for Reconstruction and Development
- OPEC Fund
- Saudi Fund for Development
- World Bank
- Asian Development Bank
Three management system certificates
O‘z DSt ISO are national standards of Uzbekistan identical to the corresponding ISO standards.
- O‘z DSt ISO 9001:2015Quality management
- O‘z DSt ISO 14001:2019Environmental management
- O‘z DSt ISO 45001:2020Occupational health and safety
Certificates issued by AVVISO CERT LLC.
Water well drilling and water supply — common questions
Do you drill artesian wells in Tashkent and other regions of Uzbekistan?
Yes. SUV-TARAQQIYOT LLC drills artesian and hydrogeological wells in 12 regions of Uzbekistan, including Tashkent city and region, Namangan, Samarkand, Kashkadarya and Syrdarya. Drilling depth is 30 to 1200 m, about 120 wells a year.
What water pipeline diameters and materials do you install?
We build transmission mains and distribution networks from 32 to 1200 mm in diameter in polyethylene (HDPE) and steel pipe — up to 200 km a year for municipal water supply and industrial sites.
Do you deliver projects financed by the World Bank, the EBRD and the OPEC Fund?
Yes. Projects in the register: Zhiydakapa water intake (NWP-6) — EBRD; Koshrabad District (W/3.1, W/4.1) — OPEC Fund and Saudi Fund for Development; Namangan City, Phase 2 (NWSP/ICB/W-4-2) — OPEC Fund; Yangiyul water supply (MSC-Y/W/1.2) — World Bank (IBRD Loan 8914-UZ), under FIDIC conditions.
